Zambia Projects Load Shedding Relief by 2026 with New Power Sources

0
550

Zambia Projects Load Shedding Relief by 2026 with New Power Sources

By Patricia Banda

Energy Minister Makozo Chikote says load shedding is expected to stabilize by 2026, thanks to the integration of three major power sources into the national electricity grid.

Responding to a question from Acting Chairperson of the Committee on Energy, Water Development and Tourism, Nkana MP Binwell Mpundu, Mr. Chikote made the remarks while presenting the 2026 Ministerial Budget Policy Statement.

He identified the new sources as:

300 megawatts from Maamba Energy Limited, an independent power producer

400 megawatts from Ezra Energy Limited, a hybrid coal and solar plant in Siavonga

Additional capacity from renewable energy sources

Mr. Chikote also revealed that the government has reduced power exports to Namibia from 180 megawatts to 50 megawatts, as part of efforts to prioritize domestic energy needs.

ZNBC