GOVERNMENT ADDRESSES WATER SUPPLY CHALLENGES AT CHILENJE HOSPITAL

0
1

The Government has drilled a borehole at Chilenje Level 1 Hospital in Lusaka to curb erratic water supply, especially as the facility has a cholera centre.

A nurse-turned-driller with a record of drilling 3,000 boreholes was contracted to drill a 100-metre borehole.
Looking for the latest sports odds and markets? Check them out here.
Gift Aqua Solutions Chief Executive Officer Gift Musonda said that the project aims to improve water reliability at the hospital.

Musonda stated that she found water at 60.2 metres before drilling to 100 metres, which gave a high yield.

She affirmed that reliable water is essential for infection prevention and control, particularly at the cholera centre.

Musonda emphasised that water is a foundational pillar of the Grow Zambia Agenda, which places water at the centre of its strategy as a strategic enabler for agriculture, energy, industry and public health, including climate resilience and WASH investment.

She added that initiatives include upgrading boreholes to piped systems and installing solar-powered water pumps, and urged more women to join the construction sector.
You could be the next winner of K20,000 sign up here

✕